Active Job · NTS-486
Alphabet EWD1A
2 × 143 MVA · Elk Grove, CA
Day 14 of 28
60%
In Progress
5 crew on site
Daily Work Report due — AI reminder at 4:00 PM
Today's Tasks
Time Log
Checked in 6:47 AM · 3h 54m · GPS ✓
Daily Work Report
Draft saved · Internal Connection pending
Internal Connection
🔒 Unlocks after DWR is submitted
CC Expense Report
Optional · Not submitted
Dictate Today's Report
Speak → AI fills the form for you
Crew on Site Today
EL
Ed Lansin (you)
DB
Dave Brooker
KC
Karl Clouser
KH
Kiana Herder
AR
Aldan Reindle
My Jobs
Active Assignment
NTS-486
Alphabet EWD1A
Alphabet / Google · 2 × 143 MVA
Elk Grove, CA
Active
Recent / Closed
NTS-481
SCE Moneta Substation
Southern California Edison
Moneta, CA
Closed
NTS-474
BIA SCIP Year 2
Bureau of Indian Affairs
Multi-site
Closed
‹
NTS-486
Alphabet EWD1A · Elk Grove, CA
Active
Project Details
Scope
2 × 143 MVA
Client
Alphabet / Google
PM
Michael Saldana
Foreman
Brad Grooms
Required Today
Time Log
Required daily · GPS verified
Daily Work Report
Required · Draft in progress
Internal Connection Report
🔒 Submit DWR first to unlock
Conditional Forms
Dew Point / Dry-Out Report
When performing dry-out work
Equipment Received
On new equipment arrival only
TFA Form
Client-specific · Not required this project
Project Documents
📋 Scope of Work
📐 Drawings
🏭 Factory Reports
⚡ Nameplate Data
‹
Daily Work Report
NTS-486 · June 11, 2026
Draft
Tap mic to dictate — AI fills the form
Project
Date
Technician
Crew Present
DB
Dave Brooker ✓
KC
Karl Clouser ✓
KH
Kiana Herder ✓
AR
Aldan Reindle ✓
+ Add
Work Performed Today
Continued HV winding assembly on Unit 2 (T2). Completed core loss readings on Unit 1 — values within spec per factory report. Installed 4 of 6 cooling radiators on T2 south face. Weather clear, 78°F.
Photos
(saved locally — uploads when connected)
🔌
⚡
Extra Work Done
(fixed same day)
Found loose gasket on south radiator bank — resealed on site. No additional materials required.
Supplemental Work Needed
(needs change order)
GPS Stamped · Elk Grove, CA
38.4088° N, 121.3716° W · Verified 6:47 AM
Internal Connection report required before final submit
Save Draft
Submit Report →
‹
Time Log
GPS Verified Check-In
Site: NTS-486 · Elk Grove, CA · 0.2 mi from center
Project
Date
CHECK IN
6:47 AM
GPS ✓
CHECK OUT
--:--
Check Out
Hours This Week
3h 54m
Today
47h
This Week
$62
Per Diem
This Week
Monday, Jun 9
NTS-486
9h 22m
GPS ✓
Tuesday, Jun 10
NTS-486
10h 5m
GPS ✓
Today, Jun 11
NTS-486 · In progress
3h 54m
Active
Field Tools
Calculators
💧
Dew Point
Ambient conditions
🧪
Moisture Content
PPM / % conversion
🔩
Torque Specs
Internal connections
⚡
Insulation Resistance
PI / DAR calc
References
Safety Procedures
Hot work, confined space, PPE matrix
IEEE Standards
C57 series transformer testing
Conductor Torque Tables
Size and kV rating reference
‹
Dew Point Calculator
Ambient Conditions
Dry Bulb Temp (°F)
Relative Humidity (%)
Calculated Dew Point
60°F
Margin to ambient: 18°F
✅ Safe for assembly — margin > 5°F required
Winding Temps (Dry-Out Tracking)
Top Oil Temp (°F)
Bottom Oil Temp (°F)
Copy to Dew Point Report