NTS Field App — Design Concept

Tap screens to navigate · Based on 2026-05-19 & 2026-05-22 meetings

9:41 AM NTS FIELD ⚡ 87%
Location Verified
NTS-486 · Elk Grove, CA · 0.2 mi from site center
ON SITE
Active Job · NTS-486
Alphabet EWD1A
2 × 143 MVA · Elk Grove, CA
Day 14 of 28
60%
In Progress 5 crew on site
Daily Work Report due — AI reminder at 4:00 PM
Today's Tasks
Time Log
Checked in 6:47 AM · 3h 54m · GPS ✓
Daily Work Report
Draft saved · Internal Connection pending
Internal Connection
🔒 Unlocks after DWR is submitted
CC Expense Report
Optional · Not submitted
Dictate Today's Report
Speak → AI fills the form for you
Crew on Site Today
EL
Ed Lansin (you)
DB
Dave Brooker
KC
Karl Clouser
KH
Kiana Herder
AR
Aldan Reindle
Active Assignment
NTS-486
Alphabet EWD1A
Alphabet / Google · 2 × 143 MVA
Elk Grove, CA
Active
Recent / Closed
NTS-481
SCE Moneta Substation
Southern California Edison
Moneta, CA
Closed
NTS-474
BIA SCIP Year 2
Bureau of Indian Affairs
Multi-site
Closed
Project Details
Scope
2 × 143 MVA
Client
Alphabet / Google
PM
Michael Saldana
Foreman
Brad Grooms
Required Today
Time Log
Required daily · GPS verified
Daily Work Report
Required · Draft in progress
Internal Connection Report
🔒 Submit DWR first to unlock
Conditional Forms
Dew Point / Dry-Out Report
When performing dry-out work
Equipment Received
On new equipment arrival only
TFA Form
Client-specific · Not required this project
Project Documents
📋 Scope of Work
📐 Drawings
🏭 Factory Reports
⚡ Nameplate Data
Tap mic to dictate — AI fills the form
DB
Dave Brooker ✓
KC
Karl Clouser ✓
KH
Kiana Herder ✓
AR
Aldan Reindle ✓
+ Add
🔌
GPS Stamped · Elk Grove, CA
38.4088° N, 121.3716° W · Verified 6:47 AM
Internal Connection report required before final submit
GPS Verified Check-In
Site: NTS-486 · Elk Grove, CA · 0.2 mi from center
CHECK IN
6:47 AM
GPS ✓
CHECK OUT
--:--
Hours This Week
3h 54m
Today
47h
This Week
$62
Per Diem
This Week
Monday, Jun 9
NTS-486
9h 22m
GPS ✓
Tuesday, Jun 10
NTS-486
10h 5m
GPS ✓
Today, Jun 11
NTS-486 · In progress
3h 54m
Active
Calculators
💧
Dew Point
Ambient conditions
🧪
Moisture Content
PPM / % conversion
🔩
Torque Specs
Internal connections
Insulation Resistance
PI / DAR calc
References
Safety Procedures
Hot work, confined space, PPE matrix
IEEE Standards
C57 series transformer testing
Conductor Torque Tables
Size and kV rating reference
Ambient Conditions
Calculated Dew Point
60°F
Margin to ambient: 18°F
✅ Safe for assembly — margin > 5°F required
Winding Temps (Dry-Out Tracking)